External ARSAS acceptance passed on exact head 3205d44. Preserve SBOw → Operate → positive CommandTermination → process feedback parity while retaining the merged static reporting milestone.
|
Exact-head validation update for
PR remains Draft and unmerged pending real external vendor external IEC 61850 client full-discovery acceptance plus ARSAS control/reporting acceptance. |
|
Windows RC artifact is now available for exact head Release Hardening run: 35336670058 Windows build, staging, NSIS packaging with official ARStack icon, and staged+installed release verification all PASS. External acceptance still required before merge:
|
Real external vendor external IEC 61850 client discovery — FAIL #2 analyzed (2026-09-18)Tested current full-discovery work against the supplied real capture Important: the old timeout/stall is fixed
Exact golden-vs-ARStack CSWI1 GVAA diff
Representative mismatches:
Source-level causes found
Correct P0 strategy
PR #102 remains Draft/unmerged. The current RC must not be treated as externally accepted. |
P0.1–P0.2 implementation checkpointHead: Implemented from the real external vendor external IEC 61850 client discovery capture:
CI is triggered on this exact head. C++ and external IEC 61850 client parity jobs are currently queued. Next phase (P0.3)Use the golden capture ordering as authority and correct synthetic LN-root/control ordering. Captured CSWI1 requires: Then P0.4 will add an exact golden CSWI1 TypeSpecification regression (72/72 paths + exact type/size/order), not only the existing self-discovery test. |
P0.3–P0.4 implementation checkpointHead: Completed after the P0.1–P0.2 wire-typing fixes:
Exact-head CI has been triggered. C++ CI and external IEC 61850 client Parity Server CI are currently queued. Next phase (P0.5)
|
P0 internal completion — exact-head green, ready for real external IEC 61850 client discoveryP0 code-side validation is complete on exact head:
Exact-head CIAll 14 workflows associated with this head completed SUCCESS, including:
external IEC 61850 client parity matrixWindows, Linux GCC, and Linux Clang all pass 8/8. The new P0 gates execute and pass on the matrix:
This locks the capture-derived CSWI1 TypeSpecification contract and preserves DPC control behavior. Reporting / RCB regressionQt production-path gates remain green:
Windows RCRelease Hardening #389 passed: Artifact:
Real external vendor external IEC 61850 client discovery against the reference IEC 61850 model CID remains the external acceptance step. Keep this PR Draft until that real-client discovery is confirmed. |
external IEC 61850 client real-control compatibility fix — implementation checkpointHead: Implemented from the real external vendor command capture:
New regression coverage:
The integration test reproduces: Negative invariants remain locked for mismatched ctlVal/origin/ctlNum/Check. Exact-head CI is running now (external IEC 61850 client parity, Control Interop, C++ matrix, Qt/reporting/RCB, Release Hardening). PR remains Draft/unmerged until real external vendor command acceptance. |
external IEC 61850 client command-fix validation complete — ready for real external vendor retestExact head: All 14 exact-head workflows completed SUCCESS. Real external IEC 61850 client control-wire gate
Each external IEC 61850 client parity matrix completed 9/9 with zero failures. The gate reproduces the real external vendor sequence: Control regression matrixControl Interop Harness PASS:
Discovery/reporting/RCB regressions also remain green:
Windows RCRelease Hardening run: Artifact:
Release verification: PR remains Draft/unmerged until real external vendor external IEC 61850 client command acceptance is confirmed. |
P0 EXTERNAL ACCEPTANCE — LOCKED BEFORE MERGEExact accepted head: Real external vendor external IEC 61850 client acceptance on 2026-09-19 against
Regression lock already in this PR:
Exact-head CI: all 14 workflows SUCCESS. This is the P0 interoperability baseline. P1 work must preserve Discovery + RCB Reporting + Control behavior and must not weaken these golden tests. |
|
You have reached your Codex usage limits for code reviews. You can see your limits in the Codex usage dashboard. |
7c1645d
into
fix/iedsim-control-command-golden-parity
P0 baseline ref createdLocked baseline branch: P1 work should branch/compare from this accepted P0 baseline and must keep the existing discovery, CSWI1 type, RCB/reporting, real external IEC 61850 client control-wire, and lifecycle golden tests green. |
Scope
Stacked on
fix/iedsim-control-command-golden-parity; keep this PR Draft until real external vendor external IEC 61850 client discovery acceptance passes.Root cause from supplied golden/failed captures
AA1E1F06R4ESQZ1/CSWI1.ctlModelas MMS INTEGER; ARStack had overridden it to UNSIGNED.Changes
ctlModelas MMS INTEGER to match external IEC 61850 client.interop_parity_full_discovery_large_model, a ~4.9k object / 32 LD regression targetingAA1E1F06R4ESQZ1/CSWI1.main/assetsicon set for Qt app/product mark, Windows executable/NSIS installer, favicon/PWA/brand surfaces.Must remain green
No merge until external external vendor external IEC 61850 client full discovery and ARSAS control/reporting acceptance.